Sudbury Primary School, Staff Areas

Timescale

6-8 weeks

Brief
  • Working closely with the school’s Chartered Surveyor, IGLOOS was asked to create a solution for renovating four staff washroom areas
  • Existing rooms required building work to reshape for their new intended use
  • Existing loos to be ripped out, plastering of walls where necessary, new ceilings and lighting system to include PIR sensors to be installed
  • Ceilings lowered to allow for floor to ceiling cubicles
  • Conversion of one stock room to male and female loos
  • Installation of one cleaners sink area
Specification
  • Bespoke WC cubicles: 2450 floor to ceiling height with independent light and emergency battery back-up and ventilation points
  • Cubicle pilasters and partitions designed to sit into polished aluminium floor channels
  • Moisture resistant melamine faced chipboard (MFC) panels for cubicles
  • Floor to ceiling IgPS access panelling system with electronic infra-red flush buttons
  • Corian® vanity units with undermounted basins and contemporary infra-red taps
  • Altro XpressLayTM Vinyl Safety Flooring capped an coved
  • Suspended ceiling with grid and integral lighting lowered to 2450mm to accommodate floor to ceiling cubicles
Design
  • Durable and moisture resistant
  • Concealed pipework
  • New doors to client specification
  • Space saving solutions incorporating clean lines with bright, attractive, contemporary colour scheme befitting a more commercial style
  • Floor to ceiling cubicles ensuring greater privacy
Installation
  • Full on-site and off-site management provided
  • Work carried out during term time with the more complex building work scheduled during school holidays