Venue

Stamford AFC, home of The Daniels

Timescale

3-4 weeks

Brief
  • Design and install a standalone toilet block to accommodate spectators
  • Hard wearing fittings
  • Maintenance considerations
  • Aesthetically considerate to the local area of Stamford using natural materials
  • Simple internal design with easy cleaning surfaces
Specification
  • Timber clad finish
  • Stainless steel urinal trough
  • Secure access
  • Concealed cisterns and pipe work where possible • Compact Grade Laminate (CGL, aka SGL) panels for cubicles
  • Heavy duty cubicle fittings
  • Wall hung basins with single pillar mixer taps • Concrete floor dust sealed
Design
  • Choice of natural materials to clad the building
  • Hard wearing fittings
  • Security access gate
  • Service void for cisterns and pipe work for ease of maintenance
  • Insulated walls and ceilings for improved building efficiency
  • Paintedfloor
  • Polycarbonate safety mirrors
Installation
  • Fabrication of structure in sections off-site for speed of insulation on-site
  • Services were brought to an agreed point by main contractor and IGLOOS® connected all plumbing and electrics
  • All crew CSCS qualified