Venue

South Ockendon Academy

Timescale

2 - 3 Weeks

Brief

Working within a newly built timber structure, IGLOOS® were asked to supply and install a full wall cladding system complete with plumbing duct, WC cubicles and Vanity Unit. Sanitaryware and plumbing would be supplied and carried out by another contractor. Consideration was made to accommodate possible expansion of the wood while still retaining a feel of the standard washroom. For use by students the washroom must be both durable and easy to maintain.

Specification
  • High pressure laminate system
  • Wide choice of material colours
  • Solid Surface vanity units with semi-recessed basins
  • Non Concussive taps
  • Polysafe Corona Flooring
  • Wall decorations
  • Highly visible indicator bolts
Design
  • Bright and welcoming
  • Aesthetically pleasing
  • Secure and safe
  • Water and energy savings
Installation
  • Full project management
  • Short Installation time

10


20


30

40

50

60