Venue
Our Lady of the Assumption
Timescale
2 Weeks
Brief
To provide a high quality refurbishment of the washroom area suitable for pre-school children that is both safe and easy to use, while remaining practical, easy to maintain and cost effective for the Nursery.
Specification
- IGLOOS Create cubicle system from Education range
- Melamine Faced Moisture Resistant Chipboard Cubicle System
- Low-level Vanity Troughs
Design
- Bright and colourful design
- Water and energy saving features
- Low-level WC Pans
- Low-level WC Cubicles offering additional passive supervision by adults
- Altro Xpress Lay safety flooring
- Safe and secure
Installation
- Full rip-out and Installation
- Installation done outside of term time