Venue

Berry Hill High School, Stoke-on-Trent

Timescale

4 Weeks

Brief

By July 2011 the washrooms at the school were in a state of disrepair due to vandalism and neglect. As a result a number of the areas were closed. IGLOOS® won the contract to refurbish the washrooms within the tight deadline of the summer holidays.

Specification
  • IgPS - IGLOOS® Plumbing Structure, was used extensively in the refurbishment
  • Compact Grade Laminate was used in the cubicles and wall paneling. This is an ideal product for environments that undergo intensive cleaning and are subject to misuse
  • Corian vanity units with a 10 year Du Pont guarantee replaced stainless steel vanity units
Design
  • Durable and water resistant
  • Bold colour scheme reflecting a contemporary feel
  • Vandal resistant mirrors creating a more
  • hospitable environment
Installation
  • Quick and clean
  • Installed during the summer holidays