July – August 2012

Venue

Eton Dorney, Dorney Lake, Windsor

Timescale

2 days interior fit-out

Brief

To supply temporary loos for hospitality area for the rowing events at Dorney Lake in a double decker structure. The loos to be designed to create a contemporary washroom befitting such a prestigious event whilst engaging with the surroundings of the sporting venue.

Solution

IGLOOS installed its Panelled range of oak vanity tops with glass bowl hand basins to fit the nautical New England theme of the hospitality enclosure. Thecubiclesmatchedthestyle with maple doors and ivory walling. Loos were constructed on ground floor only for ease of access. Largemirrorsabovethehandbasins and tall dressing room style mirrors helped create a greater sense of depth within each room. Tomeethealthandsafetyrequirements ambulant cubicles within each room had outwardsopeningdoorsandgrabrails. Inline with water board guidelines all taps were WRAS approved. IGLOOSinstalledallhanddryers.The client provided all enclosing walling, outer doors, lino flooring and a solid ceiling, however, IGLOOS can also supply these elements when required.

Total installed

WCS x 7, Urinals x 4, Hand basins x 9, Ambulant cubicles x 2, Enlarged cubicle x 1, Unisex Disabled Cubicle x 1

10


20


30

40

50

60