July – August 2012
Horse Guards Parade Athletes and the Mall, Central London
10 days interior fit-out
To supply temporary loos, showering, changing and medical areas for the Athletes and other users at the beach volley ball events at Horse GuardsParadeandtheMall. Thesewereto include disabled access facilities, cubicles and hand basins suitable for doping rooms and medical areas with all equipment unbranded.
IGLOOS installed its Panelled range of practical hand basins, cubicles and showers across 16 locations. In some areas IGLOOS provided all enclosing walling for the rooms and outer doors. In others walling just for the showers and cubicles wasinstalled. Handbasinswereselectedwith either non-concussive taps for medical rooms or lever taps suitable for disabled areas. The areas had to be highly practical for medical use for athletes and spectator emergency care as well as for doping testing. In some areas the loos and showers were connected to mains water and drainage systems. Where this was not possible IGLOOS installed vacuum tanks and pumps. As well as the loos and hand basins, IGLOOS also provided showers and created changing areas for the athletes all built inside the temporary structures. Underneath the Grandstand seating for the event IGLOOS installed Disabled Loo Modules for use by spectators.
WCs x 20 , Hand basins x 25, Showers x 16, Disabled cubicles x 5, Disabled showers x 2, Disabled Loo Modules x 8