Date
October 2008
Venue
Shopping Centre
Timescale
6 days
Brief
To install temporary loos on the 6th floor of a new shopping centre for use during the opening ceremonies. Separate areas required for staff, main guests and VIPs. Access to site restricted.
Solution
The venue was a building site for the duration of the build, therefore the units had to be unloaded and transported to the 6th floor overnightusingtheservicelift. IGLOOS® Panelled loos fitted the brief due to the flexibility of the system when considering restricted access via the lift and the available space.
Total installed
WCs x 16, Urinals x 6, Hand basins x 10, Single Loo Room with loo pan and hand basin x 2