Date

August 2008

Venue

Basement in London restaurant

Timescale

2 days

Brief

To create a temporary loo solution while the restaurant had their existing loos refurbished.

Solution

The schedule for this project was tight and we had to be flexible in our timings to run concurrently with the permanent loos project.Duetotheunusual archshapeof the basement structure IGLOOS® Panelled system was the best product due to the flexible nature of the design. Panels were cut away to fit the arched roof and a suitable solution was found for the removal of the waste and drainage points so they were not too close to the vaults. As the site was below ground the waste was pumped up and out using a system designed to liquefy the waste prior to pumping through smaller pipes. The ladies and gents areas were in two separate vaults with waste and water pipes connected via an adjoining door way.

Total installed

WCs x 5, Urinals x 2, Hand basins x 4

10


20

30

40

50